Friday 1 November 2013

Lichfield Care Home


Lichfield Care Home

Early this year AFP completed a project for Wildgoose Construction, Wissage Road Care Home, Lichfield.

This project was an intricate design, manufacture and installation project using a variety of aluminium rainwater systems:
  1. Aluminium Coping
  2. Aluminium Cladding
  3. Aluminium Downpipe's
  4. Aluminium Flashing's
  5. Aluminium Trim's

AFP worked along side Wildgoose Construction on every aspect of the aluminium work, with special emphasis of the design and installation procedure of the custom made cladding system. AFP also supplied the water proof membranes and fixing system for the complete cladding system.



The end results of this project speak for them selves, it is modern, functional, up to date and maximizes the most of the space and surrounding of the area.

2 comments:

  1. Interesting Article. Hoping that you will continue posting an article having a useful information. Soffits Solihull

    ReplyDelete
  2. Interesting Article. Iam really enjoying it with lots of information available about aluminium

    ReplyDelete